polyaspartic / epoxy flake system

The Last Garage Floor
You'll Ever Need

This two-day installation process using an epoxy base coat followed by a polyaspartic
top coat creates a stronger, more durable, and longer-lasting system than any one-day process.

Polyaspartic garage floor
MLB Stadiums
Majestic garage flooring
Majestic flooring services
Majestic polyaspartic coating

The Two-Day Difference

Epoxy Base icon

Day One: The Epoxy Base

A stronger, more durable foundation than polyaspartic alone. Most contractors skip this step entirely.

Elevation icon

One Pour Corrects Any Elevation Issue

UV stable. More abrasion-resistant.
Harder and more chemically resistant than standard epoxy finishes.

Customized icon

Customized To You

Available in custom color blends, decorative flake patterns, inlays, and borders. Every install reflects the client's specific vision.

Where Polyaspartic Flooring Performs Best

The same two-day standard applies across every residential and commercial application.

Majestic Garages

Garages

Majestic Warehouses

Warehouses

Majestic Showrooms

Showrooms

Majestic Industrial Spaces

Industrial Spaces

Majestic Basements

Basements

Schools & Hospitals flooring

Schools & Hospitals

Not Sure If Polyaspartic Is Right For Your Space?

Reach out to us and let us know the details of your project. We’ll assess your space and provide a real dollar figure to get the job done right.

Majestic Polyaspartic flooring

Why Commercial and Residential ClientsTrust Majestic For Polyaspartic Flooring

Accountable icon

A Contractor Who Remains Accountable

Aaron Poelker's personal commitment extends to every client. The job is done once, done right, and done for life. If something ever needs attention, he will come back and address it.

Asset icon

Protection of a Significant Asset

The right flooring system, installed correctly, protects the property, reduces long-term maintenance costs, and eliminates the operational risk that comes with hiring the wrong contractor.

Floor icon

A Floor That Communicates Quality

A well-finished floor reflects the quality of the business operating inside it. Clients and customers notice the space before a single conversation takes place.

Maintain icon

Easy to Clean and Maintain

Non-porous surfaces resist chemicals, moisture, and heavy use, and can be cleaned to the standard that demanding environments require.

Continuity icon

Operational Continuity

Commercial clients get back to business on schedule. No extended downtime, no disruption to operations, no scrambling around a floor that isn't ready.

Confidence icon

Compliance Confidence

Medical facilities, restaurant owners, and commercial property managers get floors that meet the sanitation, safety, and compliance standards their environments require.

What Sets Majestic’s Two-Day Process Apart?

Foundation icon

A Stronger Foundation on Day 1

The epoxy base coat creates a stronger, longer-lasting foundation than polyaspartic alone. Each layer does a specific job.

Coating icon

A Superior Top Coat on Day 2

The polyaspartic top coat is UV stable, more abrasion-resistant, harder than standard epoxy finishes, and more chemically resistant.

Better floor icon

A Better Floor Than One Day Of Work Can Produce

The two-day process is more involved than a one-day system. It produces a stronger floor that lasts longer.

Partner icon

15 Years in Business

Coverage icon

1M+ Square Feet Installed

Stadiums icon

4 MLB
Stadiums

Decor icon

Featured in Concrete Decor Magazine

Book Now To Secure Your Installation Window

Most residential installs are completed in one to two days. For commercial projects, timelines depend on the scope and square footage of the job.

Complete Majestic Flooring Solution